Renewable Energy (Solar)
Year 2023 1500V DC & 33kV Evacuation
Utility-Scale 50MW Solar Photovoltaic Plant DC Cable Laying & Perimeter Grounding Grid
Location Solapur, Maharashtra
Scope Mode Supply of Grounding Materials & Installation Supervision
Execution Time 60 Days
Compliance 100% Passed
Audited Site Deliverables & Achievements
- ✓ Supplied 45 metric tonnes of Hot Dip Galvanized earthing flats (50x6mm & 75x10mm).
- ✓ Constructed central grounding ring interconnected with 120 chemical earthing electrodes.
- ✓ Achieved combined grid earth resistance of 0.42 Ohms in rocky terrain.
- ✓ Installed outdoor lightning protection air terminals across inverter control rooms.
Project Overview
A turnkey balance-of-plant grounding and DC collection cabling project for a utility-scale solar facility in Western Maharashtra.
Scope of Delivery
- Main Grid Earthing: Heavy zinc-coated (IS 2629) galvanized flats laid in trenches surrounding the central pooling substation and inverter transformers.
- Surge & Lightning Protection: Early streamer emission (ESE) air terminals with test links and lightning strike counters.
- Turnaround: Full material dispatch completed within 14 days of PO issuance with full material test certificates.